Demolition of a building in Tertre

Etude du phasage de la démolition d'un ensemble d'anciens halls industriels.

Study of the phasing for the demolition of a set of old industrial halls.

Three important points :

  • There is asbestos in the roof
  • Industrial environnement
  • The height of the facade - between 15 en 35 meters
Go back to the project list

Quick links

Contact

  • EBC Sprl
  • Grand route, 80
  • 4367 Crisnee
  • Belgium