Demolition of a building in Tertre

Study of the phasing for the demolition of a set of old industrial halls.

Three important points :

  • There is asbestos in the roof
  • Industrial environnement
  • The height of the facade - between 15 en 35 meters
Voir projet

Factory 3B - Hydrométal

Realization of the isometric drawings

Voir projet

Methanol place

Adaptation of the methanol place with incorporation of a new distillation column.

Voir projet

Reactor tank

Sizing of two reactor tanks

Voir projet

Silo Coal

Verification of the resistance of a silo for a new affectation of the stockage of a combustible.

 

Voir projet